Availability

Warehouse and distribution facilities are available on-site from 5,000 - 9,500 sqm

DC1DC2DC3.1DC3.2Total
Warehouse (sqm)7,2284,034 7,8837,16526,310
Offices & Welfare (sqm)4132274773191,436
Mezzanine (sqm)9637469141,0663,689
Total8,6045,0079,2748,55031,435
Dock Level Doors758929
Level Entry Door11125
Bicycle Shelter111- 3
Car parking including accessibility and EV spaces55295127162
Layout1
Map Key

Masterplan not to scale. For indicative purposes only.

Specification

  • 12m internal clear height
  • 38m-deep yard (28m in concrete)
  • FM-approved ESFR sprinkler system
  • 50 kN/sqm floor loading, 90 kN per leg footplate
  • 2.4m concrete plinth around the building exterior
  • Floor flatness in accordance with DIN 18202 Table 3 Line 4
  • 300 lux LED lighting in warehouse, storage and handling areas and 500 lux lighting in offices
  • Heating to 17ºC in warehouse, 21ºC in offices
  • Fitted offices and social areas provided with climate control
  • Highly energy efficient building design

All buildings are located in a landscaped setting with trees, planting, outside shelters and seating. Bicycle parking with electric charging is designed into both facilities.

Highly energy-efficient building design

  • Highly insulated roof and façade (U = 0.2 W/m²K)
  • Roofing prepared for photovoltaic energy generation
  • Electric vehicle charging points for all units
  • Targeting BREEAM Very Good sustainability rating

Long-term building management support

Verdion will manage the building long-term and be occupiers’ main point of contact.

Our team will handle all commercial and insurance requirements and work closely with the facilities manager to ensure that the space meets occupiers’ needs.

Deliverability

Request a Callback

*You must complete the contact fields before submitting